🔧 NavajaSuiza

Kiln Firing Schedule

Schedule kiln firing schedule with this free online pottery tool

Kiln Firing Schedule

Generate a firing schedule based on target cone and firing type

Target: Cone 06 = 1828°F
Est. Total Time: 26.8 hrs
Stage 1

Initial Warm-up

Drive off residual moisture slowly

Start: 70°FEnd: 250°FRate: 80°F/hrDuration: 2.3 hrs
Stage 2

Chemical Water Release

Clay chemically bound water escaping

Start: 250°FEnd: 600°FRate: 100°F/hrDuration: 3.5 hrs
Stage 3

Vent Phase

Burn out organics, vent kiln

Start: 600°FEnd: 1000°FRate: 150°F/hrDuration: 2.7 hrs
Stage 4

Final Ramp

Complete quartz inversion, bisque maturity

Start: 1000°FEnd: 1828°FRate: 300°F/hrDuration: 2.8 hrs
Stage 5

Soak / Hold

Hold for 10 minutes at peak temperature

Start: 1828°FEnd: 1828°FDuration: 10 hrs
Stage 6

Controlled Cool

Controlled cooling for bisque

Start: 1828°FEnd: 1000°FRate: 150°F/hrDuration: 5.5 hrs
Stage 7

Free Cool

Natural cooling, do not open kiln until below 200°F

Start: 1000°FEnd: 70°FDuration:

Kiln Fireing Schedule သည် သင့်ဘရောက်ဆာတွင် လုံး၀လုပ်ဆောင်သည့် အခမဲ့ကိရိယာတစ်ခုဖြစ်သည်။ အကောင့်ဖွင့်ခြင်းမရှိ၊ ဒေါင်းလုဒ်များမပြုလုပ်ပါ — ဖွင့်ပြီးအသုံးပြုလိုက်ပါ။

Tool Information

Category
🔧 Pottery & Ceramics
Type
Processed in browser
Tags

📤 Share This Tool

Kiln Firing Schedule - Gratis Online | NavajaSuiza Digital